GROW CONTROLLER COMMISSIONING RECORD Guide: https://cropsteering.growlabs.nz/tutorials Date / operator: Host and Home Assistant version: Crop Steering integration / Controller version: Room / zone: Device models and firmware/configuration revisions: SETUP [ ] Time zone, units and local network checked. [ ] Off-host backup and recovery information saved. [ ] Controller heartbeat current; versions match. [ ] Required sensor units, freshness, placement and calibration checked. [ ] Probe data format verified for exact model (bulk / pore / feed EC distinguished). [ ] Valve and pump mappings physically traced. [ ] Plumbing topology matches the real installation. [ ] Mapping acknowledged by Controller. [ ] Plant/substrate/dripper sizing recorded. [ ] Lighting schedule, targets and limits reviewed for this crop. PHYSICAL TESTS (safe discharge / bench equipment) [ ] Timed catch test: duration ___ seconds; measured ___ mL; inferred ___ L/hour. [ ] Correct valve and pump operate; delivered water observed. [ ] Physical OFF verified; no continuing siphon. [ ] Kill switch and configured holds tested. [ ] Low-water/leak/feed protections tested as configured. [ ] Required sensor loss tested: expected ___; observed ___. [ ] Local network loss tested: expected ___; observed ___. [ ] Host/power restart tested: expected ___; observed ___. [ ] Device-local timeout / independent protection verified where required. [ ] One control owner per physical output; no conflicting timers. [ ] Lighting and climate controller recovery checked separately. [ ] Phone notification actually received; response/fallback assigned. FIRST OPERATION [ ] Only the commissioned zone enabled. [ ] Initial cycles attended; measured delivery and probe response checked. [ ] Faults resolved before expansion. [ ] Restore rehearsal completed on spare / bench hardware. Unresolved items / actions: Operator acceptance / date: This record documents your checks. It does not certify electrical work, sensor accuracy, universal hardware compatibility or facility compliance.